New drying kiln

Friday, 16 July 2021

Our 4th kiln is now up & running!

Dave checking the moisture content of the Spotted Gum in the new kiln.

This is helping dry our stock much faster, with better control.

Stripped up stock air drying in the yard, waiting for load into kilns or ready for production lines.